Wing - Right Wing

2004-09-29 - Assembling and installing the leading edge. (2.0 Hrs).

Riveted the leading edge, and started installing pop rivets in the rib-to-spar holes.

Leading edge all riveted, ready to install.
I went with the LP3-4 pop rivets, straight away this time.