Fuselage - Center Section

2005-09-05 - Preparing the center Fuselage. (4.5 Hrs).

Deburred and dimpled the holes in the seat and baggage ribs, and started on the holes in the F-776 skins.

I figured I better finish installing the F-716 seat rib access plates before we rivet the ribs to the center section. Found the right nuts and bolts, and drilled the holes.
Finish deburring and dimpling the seat ribs. I was thinking about priming the parts, but decided not to. If these ribs start corroding, then I have bigger problems.
Pile-o-ribs, all dimpled and deburred, ready to rivet.
Every damn hole has to be deburred, then dimpled.