All Major Assemblies and Subassemblies

Empennage (June 2003 - December 2004) 215 hours

Horizontal Stabilizer
2003-06-26   0.0   -  Empennage kit arrives.
2003-06-27   2.0   -  Inventory.
2003-07-09   2.5   -  Rear Horizontal Spar Assembly.
2003-07-11   3.0   -  HS-411 Assembly.
2003-07-12   5.0   -  Began work on the Front Spar Assembly.
2003-07-13   0.0   -  Created a website.
2003-07-19   7.0   -  Finish Front Spar Assembly.
2003-07-20   4.0   -  Assemble Left Horizontal Stabilizer.
2003-07-24   3.0   -  Assemble Right Horizontal Stabilizer.
2003-07-25   2.5   -  Preparing the HS parts for assembly - part 1.
2003-07-26   7.0   -  Preparing the HS parts for assembly - part 2.
2003-07-27   3.5   -  Preparing the HS parts for assembly - part 3.
2003-07-29   5.0   -  Riveting the Horizontal Stabilizer - part 1.
2003-08-02   5.0   -  Riveting the Horizontal Stabilizer.
2003-08-03   3.0   -  Riveting the Horizontal Stabilizer.
2003-08-05   2.0   -  Discovered major screw-up.
2003-08-06   1.5   -  Fixed major screw-up.
2003-08-08   2.5   -  Riveted Left skin to Front HS spar.
2003-08-09   2.5   -  Riveted Right skin to Front HS spar.
2003-08-10   6.0   -  Horizontal Stabilizer done!

Vertical Stabilizer
2003-08-12   4.0   -  Started Vertical Stabilizer.
2003-08-14   2.5   -  More Alodining.
2003-08-16   5.0   -  More deburring.
2003-08-17   4.5   -  Finally some rivets.
2003-08-18   1.5   -  Deburr the skin then rivet the outside ribs.
2003-08-19   2.5   -  VS complete!

Rudder
2003-08-23   27.0   -  Started on the Rudder.
2003-09-02   14.5   -  Rudder almost done.
2003-09-08   2.5   -  Rudder is done - except for fiberglass tips.

Elevator
2003-09-11   24.5   -  Work on elevators.
2003-09-23   14.5   -  Finished the right elevator
2003-10-03   23.0   -  Finished the Left Elevator.

Fiberglass
2003-10-18   4.0   -  Work on Right Elevator Fiberglass Tip
2003-11-11   3.0   -  Fix Screw-up, Paint Fiberglass Tips.

Paint
2003-11-02   2.0   -  Painted the Right Elevator Fiberglass Tip.
2004-12-04   2.0   -  Come in out of the rain.
2004-12-11   4.0   -  Prep and prime the HS.
2004-12-18   2.0   -  Painting the HS.
2004-12-20   1.0   -  Painting the HS.
2004-12-22   4.0   -  Painting the HS.

Wing (November 2003 - May 2007) 529 hours

Spars
2003-11-17   3.0   -  Wing kit arrives
2003-11-19   2.5   -  Inventory complete.
2003-11-25   2.0   -  Begin work on the Left Spar.
2003-11-29   3.5   -  Countersink the Left Wing Spar.
2003-11-30   5.5   -  Finish countersinking wing spars
2003-12-02   2.5   -  Fabricate tie-down assemblies
2003-12-03   2.0   -  Working on tie-down.
2003-12-06   5.5   -  Cut holes in spacers, drill tie-down asms.
2003-12-07   2.5   -  Ream out aileron bellcrank bushings
2003-12-12   4.5   -  Assembling the rear spar.
2003-12-13   5.5   -  Assembling the rear spar.
2003-12-14   1.5   -  Assembling the rear spar.
2003-12-17   1.5   -  Assembling the rear spar.
2003-12-20   4.0   -  Primed the rear spar assembly.
2003-12-21   1.0   -  Riveted the rear spar.
2004-01-02   1.0   -  Primed the countersunk holes in the spars

Ribs
2003-12-22   1.0   -  Deburring the wing ribs.
2003-12-23   4.0   -  Deburring the wing ribs
2003-12-24   3.5   -  Deburring the wing ribs.
2003-12-27   5.0   -  Deburring the wing ribs.
2003-12-28   4.5   -  Deburring the wing ribs.
2003-12-29   4.5   -  Deburring the wing ribs
2003-12-30   1.5   -  Deburring the wing ribs.
2003-12-31   3.0   -  Deburring the wing ribs
2004-01-01   3.5   -  Deburring the wing ribs.
2004-01-02   3.0   -  Deburring the wing ribs.
2004-01-03   5.5   -  Finished deburring the wing ribs.
2004-01-10   4.0   -  Straightened all wing ribs
2004-01-15   2.0   -  Drilled wing conduit holes.
2004-01-17   4.0   -  Assembled the right wing skeleton.
2004-01-18   7.0   -  Assembled the left wing skeleton.
2004-01-24   5.0   -  Prepare the wing ribs for priming.
2004-01-25   7.0   -  Primed the wing ribs.

Left Wing
2004-01-31   4.0   -  Riveted left wing skeleton.
2004-02-01   2.0   -  Finished riveting left wing skeleton.
2004-02-09   2.5   -  Fitting the top wing skins.
2004-02-15   2.0   -  Fitting the bottom wing skins.
2004-02-21   2.5   -  Fitting the leading edge.
2004-04-24   5.5   -  Wing skin preparation and assembly (debur).
2004-04-25   2.0   -  Wing skin preparation and assembly.
2004-05-01   3.0   -  Wing skin preparation and assembly.
2004-05-02   3.5   -  Wing skin preparation and assembly.
2004-05-05   3.0   -  Wing skin preparation and assembly.
2004-05-08   4.5   -  Wing skin preparation and assembly.
2004-05-09   2.0   -  Assembling the leading edge.
2004-05-11   1.5   -  Installing the leading edge.
2004-05-12   2.0   -  Installing the leading edge.
2004-05-15   2.5   -  Riveting the top skins.
2004-05-16   2.0   -  Riveting the top skins.
2004-05-22   2.0   -  Riveting the top skins.
2004-05-23   2.0   -  Riveting the top skins.
2004-07-11   8.0   -  Riveting bottom skins.
2004-07-14   2.5   -  Preparing the bottom skins.
2004-07-15   3.0   -  Riveting bottom skins.
2004-07-17   2.0   -  Riveting bottom skins.

Left Fuel Tank
2004-02-24   1.5   -  Fitting the attach angles to the spar.
2004-02-28   5.5   -  Fitting the attach angles to the baffle
2004-02-29   3.0   -  Fitting the tank skins.
2004-03-06   2.0   -  Preparing the tank stiffeners.
2004-03-07   2.5   -  Preparing the tank stiffeners.
2004-03-20   5.0   -  Fabricate the tank attach bracket.
2004-03-21   4.0   -  Finish fabricating the tank attach bracket.
2004-03-22   2.0   -  Prepared the capacitive fuel gauge senders.
2004-03-23   2.0   -  Final preparations before Pro Seal - cut hole.
2004-03-24   2.0   -  Final preparations before Pro Seal - access cover.
2004-03-25   2.0   -  Final preparations before Pro Seal - fuel cap.
2004-03-27   2.0   -  Final preparations before Pro Seal - dimple skins.
2004-03-28   3.0   -  Final preparations before Pro Seal - dimple skins.
2004-03-30   1.0   -  Final preparations before Pro Seal - fuel vent.
2004-03-31   2.0   -  Final preparations before Pro Seal - more fuel vent.
2004-04-02   3.0   -  Final preparations before ProSeal - honest!
2004-04-03   3.5   -  Assembling and sealing the tank - First ProSeal!
2004-04-04   6.0   -  Assembling and sealing the tank - First Rib.
2004-04-07   1.5   -  Assembling and sealing the tank - Second Rib.
2004-04-10   3.0   -  Assembling and sealing the tank - Ribs 3-4.
2004-04-11   7.0   -  Ribs 5-6, capacitive senders, fuel vent.
2004-04-14   2.5   -  Assembling and sealing the tank - Last Rib.
2004-04-15   1.0   -  Assembling and sealing the tank - Final goop.
2004-04-17   8.5   -  Assembling and sealing the tank - Baffle.
2004-04-18   2.0   -  Assembling and sealing the tank - Access Cover.
2004-04-19   1.0   -  Assembling and sealing the tank - Leak Test.
2004-04-20   0.5   -  Assembling and sealing the tank - Leak Test.
2004-04-21   0.5   -  Assembling and sealing the tank - Leak Test Passed.

Left Flaps and Ailerons
2004-05-24   1.0   -  Installing the aileron brackets.
2004-05-28   1.0   -  Preparing the aileron brackets.
2004-05-29   4.0   -  Priming the aileron and flap parts.
2004-05-30   2.0   -  Installing the aileron brackets.
2004-05-31   2.0   -  Installing the flap brace.
2004-06-02   1.5   -  Flap hindge.
2004-06-04   2.0   -  Flap hindge.
2004-06-05   4.0   -  Flap and Aileron parts.
2004-06-06   4.0   -  Deburr flap and aileron parts.
2004-06-07   2.0   -  Deburr aileron stiffeners.
2004-06-08   3.0   -  Deburr aileron stiffeners.
2004-06-09   2.0   -  Aileron bellcrank and pitot tube.
2004-06-12   5.5   -  Flap and aileron preparation.
2004-06-13   5.0   -  Flap and aileron preparation.
2004-06-15   2.0   -  Flap and aileron preparation.
2004-06-16   1.0   -  Flap and aileron preparation.
2004-06-18   3.5   -  Aileron assembly.
2004-07-04   5.5   -  Aileron assembly.
2004-07-05   3.0   -  Flap assembly.
2004-07-07   2.0   -  Flap assembly.
2004-07-10   6.0   -  Flap assembly.

Right Wing
2004-08-12   2.5   -  Started riveting the right wing skeleton.
2004-08-14   4.5   -  Right wing skeleton in the stand.
2004-08-15   4.0   -  Fitting the bottom wing skins .
2004-09-19   3.5   -  Wing skin preparation and assembly.
2004-09-25   5.0   -  Wing skin preparation and assembly.
2004-09-26   6.0   -  Assembling the leading edge.
2004-09-29   2.0   -  Assembling and installing the leading edge.
2004-10-02   4.5   -  Riveting the top skins.
2004-10-03   4.0   -  Riveting the top skins.
2004-10-29   4.0   -  Fitting the bottom wing skins.
2004-10-30   4.0   -  Riveting the bottom wing skins .
2004-10-31   4.0   -  Riveting the bottom wing skins.
2004-11-02   2.0   -  Riveting the bottom wing skins.
2007-04-22   3.0   -  Inspection covers and Rats.
2007-05-20   1.5   -  Touch-up right bellcrank.

Right Fuel Tank
2004-08-17   2.5   -  Assembling the fuel tank (Z-brackets).
2004-08-18   2.5   -  Assembling the fuel tank (Z-bracket nutplates ).
2004-08-20   3.5   -  Assembling the fuel tank (drill ribs, fit tank).
2004-08-21   3.0   -  Assembling the right fuel tank (countersink rear baffle).
2004-08-22   1.5   -  Preparing the right fuel tank (cut stiffeners).
2004-08-24   2.5   -  Preparing the right fuel tank (stiffeners and fuel cap).
2004-08-25   3.0   -  Preparing the right fuel tank (T-405 tank attach angle).
2004-08-26   1.5   -  Preparing the right fuel tank (access cover).
2004-08-28   3.5   -  Preparing the right fuel tank (fuel pickup, access cover).
2004-08-29   8.0   -  Preparing the right fuel tank (Final prep).
2004-08-30   0.5   -  Preparing the right fuel tank (Fix screwup).
2004-08-31   2.5   -  Assembling and sealing the right fuel tank (stiffeners).
2004-09-01   3.0   -  Assembling and sealing the right fuel tank (first rib).
2004-09-03   3.0   -  Assembling and sealing the right fuel tank (three ribs).
2004-09-04   5.5   -  Assembling and sealing the right fuel tank (cap senders).
2004-09-05   4.5   -  Assembling and sealing the right fuel tank (end ribs).
2004-09-06   6.5   -  Assembling and sealing the right fuel tank (rear baffle).
2004-09-08   2.0   -  Assembling and sealing the right fuel tank (access cover).
2004-09-09   0.5   -  Leak testing the right fuel tank.
2004-09-10   0.0   -  Leak test passed.

Right Flaps and ailerons
2004-10-06   1.0   -  Installing the aileron brackets.
2004-10-08   3.0   -  Installing the aileron brackets.
2004-10-09   3.0   -  Preparing to prime the aileron and flap parts.
2004-10-10   2.0   -  Preparing to prime the aileron and flap parts.
2004-10-11   5.0   -  Preparing to prime the aileron and flap parts.
2004-10-15   3.0   -  Preparing to prime the aileron and flap parts.
2004-10-16   5.0   -  Priming the aileron and flap parts.
2004-10-17   4.0   -  Installing the flap brace and aileron gap fairings.
2004-10-19   2.0   -  Ailerons (right, 1 each).
2004-10-21   2.5   -  Assembling the right aileron.
2004-10-23   7.0   -  Assembling the right flap.
2004-10-24   2.0   -  Fitting the right flap and aileron.

Fiberglass
2004-07-31   2.5   -  Left wing tip.
2004-08-01   5.0   -  Left wing tip.
2004-08-07   6.0   -  Left wing tip.
2004-11-21   3.5   -  Right wing tip.
2004-11-26   3.0   -  Right wing tip.
2004-11-28   2.0   -  Right wing tip.

Fixtures and stands
2004-02-08   15.0   -  Building the wing stand.
2004-02-14   1.0   -  Building the cradle.
2004-07-18   3.0   -  Building the wing storage rack.
2004-07-24   3.0   -  Building the wing storage rack.
2004-07-29   1.0   -  Finished the wing storage rack.
2004-11-07   6.0   -  Building a paint stand..
2004-11-14   1.0   -  Finished building a paint stand.
2007-05-19   1.0   -  Build another mini wing stand.
2007-05-27   1.0   -  Got rid of the old wing stand.

Fuselage (December 2004 - October 2007) 650.5 hours

Bulkheads
2004-12-30   6.0   -  Fuselage Kit arrives.
2004-12-31   6.0   -  Fuselage Kit Inventory.
2005-01-05   3.0   -  Fuselage Kit Inventory.
2005-01-06   0.5   -  Fuselage Kit Inventory.
2005-01-07   3.0   -  Preparing the bulkheads - firewall.
2005-01-08   5.0   -  Preparing the bulkheads - firewall.
2005-01-09   5.0   -  Preparing the bulkheads - firewall.
2005-01-11   2.0   -  Deburring the firewall.
2005-01-12   1.5   -  Alodining the firewall stiffeners.
2005-01-14   2.0   -  Dimple and start riveting the firewall.
2005-01-15   3.0   -  Riveting the firewall.
2005-01-16   4.0   -  Assembling the F-704 bulkhead.
2005-01-18   2.0   -  Assembling the F-704 bulkhead.
2005-01-23   4.0   -  Assembling the F-704 bulkhead.
2005-01-29   5.0   -  Assembling the F-704 bulkhead.
2005-01-30   5.0   -  Assembling the F-704 bulkhead.
2005-02-05   3.0   -  Assembling the F-704 bulkhead.
2005-02-11   2.0   -  Assembling the F-704 bulkhead.
2005-02-12   4.0   -  Assembling the F-704 bulkhead.
2005-02-13   5.0   -  Finish F-704 bulkhead, start F-705.
2005-02-18   2.0   -  Assembling the F-705 bulkhead.
2005-02-19   4.5   -  Assembling the F-705 bulkhead.
2005-02-20   6.0   -  Assembling the F-705 bulkhead.
2005-05-11   1.0   -  Assembling the F-705 bulkhead.
2005-05-18   2.0   -  Assembling the F-705 bulkhead.
2005-05-20   3.0   -  Assembling the F-705 bulkhead.
2005-05-25   2.0   -  Finish assembling the F-705 bulkhead.
2005-05-29   6.0   -  Assembling the F-706 bulkhead.
2005-06-01   2.0   -  Assembling the F-706 bulkhead.
2005-06-14   8.0   -  Deburring the F-707, 708, 709 bulkheads.
2005-06-16   5.0   -  Deburring the F-711, and 712 bulkheads.
2005-06-19   3.5   -  Deburring and painting the bulkheads.
2005-07-04   5.0   -  Riveting the rear bulkheads.

AFT Section
2005-07-06   2.0   -  Finish the rear bulkheads, cut the longerons!
2005-07-08   2.0   -  Bending the longerons!
2005-07-09   3.5   -  Bending the right longeron.
2005-07-11   3.5   -  Finishing the J-Channel.
2005-07-17   4.0   -  AFT Fuselage Assembly.
2005-07-20   2.0   -  AFT Fuselage Assembly.
2005-07-23   3.0   -  AFT Fuselage Assembly.
2005-07-24   3.0   -  AFT Fuselage Assembly.
2005-07-28   2.0   -  Debur AFT Fuselage Assembly.
2005-07-30   4.5   -  Debur AFT Fuselage Assembly.
2005-07-31   3.5   -  Debur AFT Fuselage Assembly.
2005-08-06   5.5   -  AFT Fuselage Assembly.
2005-08-07   4.5   -  AFT Fuselage Assembly.
2005-08-13   4.0   -  AFT Fuselage Assembly.

Center Section
2005-08-14   3.5   -  Preparing the center Fuselage.
2005-08-19   2.0   -  Preparing the center Fuselage.
2005-08-20   4.0   -  Preparing the center Fuselage.
2005-08-21   5.0   -  Preparing the center Fuselage.
2005-08-23   2.0   -  Preparing the center Fuselage.
2005-08-27   3.5   -  Preparing the center Fuselage.
2005-08-28   3.5   -  Preparing the center Fuselage.
2005-09-02   5.0   -  Preparing the center Fuselage.
2005-09-03   2.0   -  Preparing the center Fuselage.
2005-09-04   4.0   -  Preparing the center Fuselage.
2005-09-05   4.5   -  Preparing the center Fuselage.
2005-09-09   3.0   -  Preparing the center Fuselage.
2005-09-10   5.5   -  Preparing the center Fuselage.
2005-09-11   5.0   -  Assembling the center Fuselage--finally.
2005-09-13   2.0   -  Assembling the center Fuselage.
2005-09-14   2.5   -  Assembling the center Fuselage.
2005-09-16   5.0   -  Assembling the center Fuselage.
2005-09-17   3.0   -  Finished assembling the center Fuselage.
2005-09-23   2.5   -  Joining the rear and center fuselage Assys.
2005-10-02   5.0   -  Joining the rear and center fuselage Assys.
2005-10-16   3.0   -  Joining the rear and center fuselage Assys.
2005-10-23   4.0   -  Drilled the longerons.

Forward Section
2005-11-20   0.0   -  Out of space.
2005-11-25   5.0   -  Adding the forward fuselage.
2005-11-26   3.5   -  Adding the forward fuselage.
2005-12-04   3.5   -  Installing the aux longerons (F-713).
2005-12-10   3.0   -  Installing the aux longerons (F-719).
2005-12-11   2.0   -  Installing the aux longerons (F-719).
2005-12-17   6.0   -  Installing the aux longerons (F-717).
2005-12-18   3.5   -  Installing the aux longerons (F-684 gussets).
2005-12-19   3.5   -  Installing the forward bulkheads (F-902).
2005-12-20   3.0   -  Installing the forward bulkheads (F-786C).
2005-12-21   2.5   -  Installing the forward bulkheads (F-786B).
2005-12-22   2.5   -  Installing the forward bulkheads (F-786B).
2005-12-24   2.0   -  Installing the rudder and brake pedals.
2005-12-26   3.5   -  Installing the rudder and brake pedals.
2005-12-27   3.0   -  Installing the rudder and brake pedals.
2005-12-28   3.0   -  Installing the rudder and brake pedals.
2005-12-29   4.0   -  Installing the rudder and brake pedals.
2005-12-30   1.5   -  Installing the rudder and brake pedals.
2006-01-02   4.0   -  Installing the rudder and brake pedals.
2006-01-07   6.0   -  Installing the rudder and brake pedals.
2006-01-08   4.5   -  Installing the floor stiffeners.
2006-01-14   5.0   -  The Cabin - Framing the baggage area.
2006-01-15   4.0   -  Preparing to rivet the side skins.
2006-01-21   3.0   -  Preparing to rivet the side skins.
2006-01-22   3.5   -  Preparing to rivet the side skins.
2006-01-28   3.0   -  Preparing to rivet the side skins.
2006-01-29   2.0   -  Preparing to rivet the side skins.
2006-02-04   4.0   -  Preparing to rivet the side skins.
2006-02-05   4.5   -  Preparing to rivet the side skins.
2006-02-12   4.0   -  Preparing to rivet the side skins.
2006-02-18   4.0   -  Preparing to rivet the side skins.
2006-02-19   4.0   -  Preparing to rivet the side skins - right step.
2006-02-25   5.0   -  Preparing to rivet the side skins - left step.
2006-02-26   4.0   -  Preparing to rivet the side skins - step prep.
2006-03-04   4.0   -  Preparing to rivet the side skins - deburring.
2006-03-05   5.0   -  Preparing to rivet the side skins - baggage nutplates.
2006-03-12   3.5   -  Riveting the side skins - center section AFT edge.
2006-04-02   2.0   -  Riveting the side skins - preparing the left side skin.
2006-04-08   3.5   -  Riveting the side skins - start with the left side.
2006-04-09   3.0   -  Riveting the side skins - start on the right side.
2006-04-15   6.0   -  Riveting the side skins - more prep.
2006-04-16   4.0   -  Fit the main gear before riveting the side skins.
2006-04-22   5.5   -  More fitting the main gear before riveting the side skins.
2006-04-23   4.5   -  Riveting the side skins - FWD section.
2006-04-29   2.0   -  Riveting the side skins - left bottom rivets.
2006-04-30   3.0   -  Riveting the side skins - right bottom rivets.
2006-05-06   3.0   -  Riveting the side skins - this and that.
2006-05-20   2.0   -  Riveting the side skins - finished.
2006-06-11   0.5   -  Tipped the canoe.

Fixtures and stands
2006-06-25   4.5   -  Building the fuselage stand.

Top
2006-07-01   1.0   -  Finishing up after the tip.
2006-07-02   4.0   -  Riveting F-714 to the AFT fuselage.
2006-07-03   4.5   -  Installing the side rails.
2006-07-04   4.0   -  Installing the side rails.
2006-07-08   4.5   -  Installing the side rails and F-695 gussets.
2006-07-09   4.0   -  F-695 gussets, F-636, and more.
2006-07-15   4.5   -  Elevator bellcrank and F-656 gusset plates.
2006-07-16   4.5   -  Fitting the AFT top skins.
2006-07-22   4.5   -  Fitting the AFT top skins.

Cabin
2006-07-23   4.0   -  The baggage compartment (steps and AFT side covers).
2006-07-29   3.5   -  The baggage compartment (steps and AFT side covers).
2006-07-30   4.5   -  The baggage compartment (baggage bulkhead).
2006-08-05   6.0   -  The baggage compartment (F-706 nutplates).
2006-08-06   5.5   -  The baggage compartment (cable wear blocks).
2006-08-12   5.0   -  The baggage compartment (deburr baggage bulkhead).
2006-08-13   4.0   -  The baggage compartment (baggage bulkhead).
2006-08-19   6.0   -  AFT seat floors (left seat hindges).
2006-08-20   5.5   -  AFT seat floors and baggage floor access cover.
2006-08-26   4.0   -  Baggage floor access covers (right side).
2006-08-27   5.5   -  Baggage floor access covers (left side).
2006-09-02   4.0   -  AFT seat floors (riveting the hindges).
2006-09-03   4.0   -  FWD seat floors and control rod tunnel.
2006-09-04   4.5   -  FWD seat floors and control rod tunnel.
2006-09-05   5.0   -  Rear spar spacer, Seat backs.
2006-09-06   4.5   -  Seat backs.
2006-09-09   6.0   -  Seat backs (right seat).
2006-09-10   5.5   -  Seat backs (left seat).
2006-09-16   6.0   -  Forward covers.
2006-09-17   5.0   -  Forward covers.
2006-10-01   4.0   -  The electric flaps.
2006-10-07   5.5   -  The electric flaps.
2006-10-08   5.0   -  The electric flaps.
2006-10-14   3.0   -  The electric flaps.
2006-10-15   4.5   -  The electric flaps - done.
2006-10-21   5.0   -  Installing the landing gear mounts (RV-7A only).
2006-10-22   4.5   -  Finished installing the landing gear mounts.
2006-10-28   2.0   -  Installed the main gear legs.
2006-10-29   3.5   -  Control stick and rudder pedal assemblies.
2006-11-04   4.0   -  Futzing around before fitting the wings.
2006-11-05   5.0   -  Installing the front deck (slider only).
2006-11-11   4.5   -  Installing the front deck (framework parts).
2006-11-12   4.5   -  Installing the front deck (fake instrument pictures).
2006-11-18   3.5   -  Installing the front deck (match drill top skin).
2006-11-19   4.5   -  Installing the front deck (F-721 attach angles).
2006-11-22   5.0   -  Installing the front deck (side vents).
2006-11-24   5.0   -  Installing the front deck (top skin).
2006-11-25   3.0   -  Fixing the screw-up (top skin).
2006-12-02   0.0   -  Ready to fit the wings (a little diversion).
2006-12-22   0.0   -  Ready to fit the wings (lost motivation).
2007-05-13   0.0   -  Ready to fit the wings (need bolts).
2007-05-19   0.0   -  Ready to fit the wings (have bolts).
2007-09-02   4.5   -  Fit the right wing.
2007-09-03   1.0   -  Futzing around with the right wing flaps.
2007-09-08   4.0   -  Fabricate F-795 flap push rods.
2007-09-09   3.5   -  Finish F-795 flap push rods.
2007-09-29   1.0   -  Cutting hole for right F-795 flap push rod.
2007-09-30   2.0   -  Finish cutting hole for right F-795 flap push rod.
2007-10-13   2.0   -  Remove right wing.

Firewall Forward (December 2004 - April 2009) 90.5 hours

Cooling System
2005-02-06   4.0   -  Oil Cooler arrives.
2005-02-10   1.0   -  Straighten Oil Cooler fins.

Engine
2004-12-10   0.0   -  Research.
2005-02-21   8.0   -  Engine tear-down.
2005-03-13   8.0   -  Engine tear-down.
2005-03-20   10.0   -  Engine clean-up.
2005-04-03   10.0   -  Engine clean-up.
2005-04-09   7.0   -  Engine clean-up.
2005-04-17   10.0   -  Engine clean-up.
2005-04-24   5.0   -  Engine clean-up.
2005-05-01   2.0   -  Engine clean-up.
2005-05-19   0.5   -  New engine arrives.
2005-07-10   4.0   -  Cleaning parts and the garage.
2007-05-19   0.0   -  Got the redrive.
2007-08-26   4.0   -  Repaint the oil pan, again.
2008-08-05   0.0   -  We have an engine mount.
2008-08-10   2.0   -  Painted the engine mount.
2008-11-09   2.0   -  Started Building-up the Engine.
2009-04-18   1.0   -  Engine Build - Big Nut, Counter Weight, Drive Plate.

Engine Test Stand
2008-09-01   10.0   -  Building the Engine Test Stand.
2008-09-20   2.0   -  Finished Building the Engine Test Stand.

Interior (November 2006 - July 2008) 16.5 hours

Seat cushions and backs
2006-11-16   4.0   -  Sewed first seat cushion.
2006-11-24   4.0   -  Sewed first seat back cover.
2008-06-21   4.0   -  Sewed second seat cushion.
2008-06-28   4.0   -  Sewed second seat Back cover - seats are done.
2008-07-05   0.5   -  Pictures of finished upholestry.