All Major Assemblies and Subassemblies
Empennage (June 2003 - December 2004) 215 hours
Horizontal Stabilizer
2003-06-26 | 0.0 | - Empennage kit arrives. |
2003-06-27 | 2.0 | - Inventory. |
2003-07-09 | 2.5 | - Rear Horizontal Spar Assembly. |
2003-07-11 | 3.0 | - HS-411 Assembly. |
2003-07-12 | 5.0 | - Began work on the Front Spar Assembly. |
2003-07-13 | 0.0 | - Created a website. |
2003-07-19 | 7.0 | - Finish Front Spar Assembly. |
2003-07-20 | 4.0 | - Assemble Left Horizontal Stabilizer. |
2003-07-24 | 3.0 | - Assemble Right Horizontal Stabilizer. |
2003-07-25 | 2.5 | - Preparing the HS parts for assembly - part 1. |
2003-07-26 | 7.0 | - Preparing the HS parts for assembly - part 2. |
2003-07-27 | 3.5 | - Preparing the HS parts for assembly - part 3. |
2003-07-29 | 5.0 | - Riveting the Horizontal Stabilizer - part 1. |
2003-08-02 | 5.0 | - Riveting the Horizontal Stabilizer. |
2003-08-03 | 3.0 | - Riveting the Horizontal Stabilizer. |
2003-08-05 | 2.0 | - Discovered major screw-up. |
2003-08-06 | 1.5 | - Fixed major screw-up. |
2003-08-08 | 2.5 | - Riveted Left skin to Front HS spar. |
2003-08-09 | 2.5 | - Riveted Right skin to Front HS spar. |
2003-08-10 | 6.0 | - Horizontal Stabilizer done! |
Vertical Stabilizer
2003-08-12 | 4.0 | - Started Vertical Stabilizer. |
2003-08-14 | 2.5 | - More Alodining. |
2003-08-16 | 5.0 | - More deburring. |
2003-08-17 | 4.5 | - Finally some rivets. |
2003-08-18 | 1.5 | - Deburr the skin then rivet the outside ribs. |
2003-08-19 | 2.5 | - VS complete! |
Rudder
2003-08-23 | 27.0 | - Started on the Rudder. |
2003-09-02 | 14.5 | - Rudder almost done. |
2003-09-08 | 2.5 | - Rudder is done - except for fiberglass tips. |
Elevator
2003-09-11 | 24.5 | - Work on elevators. |
2003-09-23 | 14.5 | - Finished the right elevator |
2003-10-03 | 23.0 | - Finished the Left Elevator. |
Fiberglass
2003-10-18 | 4.0 | - Work on Right Elevator Fiberglass Tip |
2003-11-11 | 3.0 | - Fix Screw-up, Paint Fiberglass Tips. |
Paint
2003-11-02 | 2.0 | - Painted the Right Elevator Fiberglass Tip. |
2004-12-04 | 2.0 | - Come in out of the rain. |
2004-12-11 | 4.0 | - Prep and prime the HS. |
2004-12-18 | 2.0 | - Painting the HS. |
2004-12-20 | 1.0 | - Painting the HS. |
2004-12-22 | 4.0 | - Painting the HS. |
Wing (November 2003 - May 2007) 529 hours
Spars
2003-11-17 | 3.0 | - Wing kit arrives |
2003-11-19 | 2.5 | - Inventory complete. |
2003-11-25 | 2.0 | - Begin work on the Left Spar. |
2003-11-29 | 3.5 | - Countersink the Left Wing Spar. |
2003-11-30 | 5.5 | - Finish countersinking wing spars |
2003-12-02 | 2.5 | - Fabricate tie-down assemblies |
2003-12-03 | 2.0 | - Working on tie-down. |
2003-12-06 | 5.5 | - Cut holes in spacers, drill tie-down asms. |
2003-12-07 | 2.5 | - Ream out aileron bellcrank bushings |
2003-12-12 | 4.5 | - Assembling the rear spar. |
2003-12-13 | 5.5 | - Assembling the rear spar. |
2003-12-14 | 1.5 | - Assembling the rear spar. |
2003-12-17 | 1.5 | - Assembling the rear spar. |
2003-12-20 | 4.0 | - Primed the rear spar assembly. |
2003-12-21 | 1.0 | - Riveted the rear spar. |
2004-01-02 | 1.0 | - Primed the countersunk holes in the spars |
Ribs
2003-12-22 | 1.0 | - Deburring the wing ribs. |
2003-12-23 | 4.0 | - Deburring the wing ribs |
2003-12-24 | 3.5 | - Deburring the wing ribs. |
2003-12-27 | 5.0 | - Deburring the wing ribs. |
2003-12-28 | 4.5 | - Deburring the wing ribs. |
2003-12-29 | 4.5 | - Deburring the wing ribs |
2003-12-30 | 1.5 | - Deburring the wing ribs. |
2003-12-31 | 3.0 | - Deburring the wing ribs |
2004-01-01 | 3.5 | - Deburring the wing ribs. |
2004-01-02 | 3.0 | - Deburring the wing ribs. |
2004-01-03 | 5.5 | - Finished deburring the wing ribs. |
2004-01-10 | 4.0 | - Straightened all wing ribs |
2004-01-15 | 2.0 | - Drilled wing conduit holes. |
2004-01-17 | 4.0 | - Assembled the right wing skeleton. |
2004-01-18 | 7.0 | - Assembled the left wing skeleton. |
2004-01-24 | 5.0 | - Prepare the wing ribs for priming. |
2004-01-25 | 7.0 | - Primed the wing ribs. |
Left Wing
2004-01-31 | 4.0 | - Riveted left wing skeleton. |
2004-02-01 | 2.0 | - Finished riveting left wing skeleton. |
2004-02-09 | 2.5 | - Fitting the top wing skins. |
2004-02-15 | 2.0 | - Fitting the bottom wing skins. |
2004-02-21 | 2.5 | - Fitting the leading edge. |
2004-04-24 | 5.5 | - Wing skin preparation and assembly (debur). |
2004-04-25 | 2.0 | - Wing skin preparation and assembly. |
2004-05-01 | 3.0 | - Wing skin preparation and assembly. |
2004-05-02 | 3.5 | - Wing skin preparation and assembly. |
2004-05-05 | 3.0 | - Wing skin preparation and assembly. |
2004-05-08 | 4.5 | - Wing skin preparation and assembly. |
2004-05-09 | 2.0 | - Assembling the leading edge. |
2004-05-11 | 1.5 | - Installing the leading edge. |
2004-05-12 | 2.0 | - Installing the leading edge. |
2004-05-15 | 2.5 | - Riveting the top skins. |
2004-05-16 | 2.0 | - Riveting the top skins. |
2004-05-22 | 2.0 | - Riveting the top skins. |
2004-05-23 | 2.0 | - Riveting the top skins. |
2004-07-11 | 8.0 | - Riveting bottom skins. |
2004-07-14 | 2.5 | - Preparing the bottom skins. |
2004-07-15 | 3.0 | - Riveting bottom skins. |
2004-07-17 | 2.0 | - Riveting bottom skins. |
Left Fuel Tank
2004-02-24 | 1.5 | - Fitting the attach angles to the spar. |
2004-02-28 | 5.5 | - Fitting the attach angles to the baffle |
2004-02-29 | 3.0 | - Fitting the tank skins. |
2004-03-06 | 2.0 | - Preparing the tank stiffeners. |
2004-03-07 | 2.5 | - Preparing the tank stiffeners. |
2004-03-20 | 5.0 | - Fabricate the tank attach bracket. |
2004-03-21 | 4.0 | - Finish fabricating the tank attach bracket. |
2004-03-22 | 2.0 | - Prepared the capacitive fuel gauge senders. |
2004-03-23 | 2.0 | - Final preparations before Pro Seal - cut hole. |
2004-03-24 | 2.0 | - Final preparations before Pro Seal - access cover. |
2004-03-25 | 2.0 | - Final preparations before Pro Seal - fuel cap. |
2004-03-27 | 2.0 | - Final preparations before Pro Seal - dimple skins. |
2004-03-28 | 3.0 | - Final preparations before Pro Seal - dimple skins. |
2004-03-30 | 1.0 | - Final preparations before Pro Seal - fuel vent. |
2004-03-31 | 2.0 | - Final preparations before Pro Seal - more fuel vent. |
2004-04-02 | 3.0 | - Final preparations before ProSeal - honest! |
2004-04-03 | 3.5 | - Assembling and sealing the tank - First ProSeal! |
2004-04-04 | 6.0 | - Assembling and sealing the tank - First Rib. |
2004-04-07 | 1.5 | - Assembling and sealing the tank - Second Rib. |
2004-04-10 | 3.0 | - Assembling and sealing the tank - Ribs 3-4. |
2004-04-11 | 7.0 | - Ribs 5-6, capacitive senders, fuel vent. |
2004-04-14 | 2.5 | - Assembling and sealing the tank - Last Rib. |
2004-04-15 | 1.0 | - Assembling and sealing the tank - Final goop. |
2004-04-17 | 8.5 | - Assembling and sealing the tank - Baffle. |
2004-04-18 | 2.0 | - Assembling and sealing the tank - Access Cover. |
2004-04-19 | 1.0 | - Assembling and sealing the tank - Leak Test. |
2004-04-20 | 0.5 | - Assembling and sealing the tank - Leak Test. |
2004-04-21 | 0.5 | - Assembling and sealing the tank - Leak Test Passed. |
Left Flaps and Ailerons
2004-05-24 | 1.0 | - Installing the aileron brackets. |
2004-05-28 | 1.0 | - Preparing the aileron brackets. |
2004-05-29 | 4.0 | - Priming the aileron and flap parts. |
2004-05-30 | 2.0 | - Installing the aileron brackets. |
2004-05-31 | 2.0 | - Installing the flap brace. |
2004-06-02 | 1.5 | - Flap hindge. |
2004-06-04 | 2.0 | - Flap hindge. |
2004-06-05 | 4.0 | - Flap and Aileron parts. |
2004-06-06 | 4.0 | - Deburr flap and aileron parts. |
2004-06-07 | 2.0 | - Deburr aileron stiffeners. |
2004-06-08 | 3.0 | - Deburr aileron stiffeners. |
2004-06-09 | 2.0 | - Aileron bellcrank and pitot tube. |
2004-06-12 | 5.5 | - Flap and aileron preparation. |
2004-06-13 | 5.0 | - Flap and aileron preparation. |
2004-06-15 | 2.0 | - Flap and aileron preparation. |
2004-06-16 | 1.0 | - Flap and aileron preparation. |
2004-06-18 | 3.5 | - Aileron assembly. |
2004-07-04 | 5.5 | - Aileron assembly. |
2004-07-05 | 3.0 | - Flap assembly. |
2004-07-07 | 2.0 | - Flap assembly. |
2004-07-10 | 6.0 | - Flap assembly. |
Right Wing
2004-08-12 | 2.5 | - Started riveting the right wing skeleton. |
2004-08-14 | 4.5 | - Right wing skeleton in the stand. |
2004-08-15 | 4.0 | - Fitting the bottom wing skins . |
2004-09-19 | 3.5 | - Wing skin preparation and assembly. |
2004-09-25 | 5.0 | - Wing skin preparation and assembly. |
2004-09-26 | 6.0 | - Assembling the leading edge. |
2004-09-29 | 2.0 | - Assembling and installing the leading edge. |
2004-10-02 | 4.5 | - Riveting the top skins. |
2004-10-03 | 4.0 | - Riveting the top skins. |
2004-10-29 | 4.0 | - Fitting the bottom wing skins. |
2004-10-30 | 4.0 | - Riveting the bottom wing skins . |
2004-10-31 | 4.0 | - Riveting the bottom wing skins. |
2004-11-02 | 2.0 | - Riveting the bottom wing skins. |
2007-04-22 | 3.0 | - Inspection covers and Rats. |
2007-05-20 | 1.5 | - Touch-up right bellcrank. |
Right Fuel Tank
2004-08-17 | 2.5 | - Assembling the fuel tank (Z-brackets). |
2004-08-18 | 2.5 | - Assembling the fuel tank (Z-bracket nutplates ). |
2004-08-20 | 3.5 | - Assembling the fuel tank (drill ribs, fit tank). |
2004-08-21 | 3.0 | - Assembling the right fuel tank (countersink rear baffle). |
2004-08-22 | 1.5 | - Preparing the right fuel tank (cut stiffeners). |
2004-08-24 | 2.5 | - Preparing the right fuel tank (stiffeners and fuel cap). |
2004-08-25 | 3.0 | - Preparing the right fuel tank (T-405 tank attach angle). |
2004-08-26 | 1.5 | - Preparing the right fuel tank (access cover). |
2004-08-28 | 3.5 | - Preparing the right fuel tank (fuel pickup, access cover). |
2004-08-29 | 8.0 | - Preparing the right fuel tank (Final prep). |
2004-08-30 | 0.5 | - Preparing the right fuel tank (Fix screwup). |
2004-08-31 | 2.5 | - Assembling and sealing the right fuel tank (stiffeners). |
2004-09-01 | 3.0 | - Assembling and sealing the right fuel tank (first rib). |
2004-09-03 | 3.0 | - Assembling and sealing the right fuel tank (three ribs). |
2004-09-04 | 5.5 | - Assembling and sealing the right fuel tank (cap senders). |
2004-09-05 | 4.5 | - Assembling and sealing the right fuel tank (end ribs). |
2004-09-06 | 6.5 | - Assembling and sealing the right fuel tank (rear baffle). |
2004-09-08 | 2.0 | - Assembling and sealing the right fuel tank (access cover). |
2004-09-09 | 0.5 | - Leak testing the right fuel tank. |
2004-09-10 | 0.0 | - Leak test passed. |
Right Flaps and ailerons
2004-10-06 | 1.0 | - Installing the aileron brackets. |
2004-10-08 | 3.0 | - Installing the aileron brackets. |
2004-10-09 | 3.0 | - Preparing to prime the aileron and flap parts. |
2004-10-10 | 2.0 | - Preparing to prime the aileron and flap parts. |
2004-10-11 | 5.0 | - Preparing to prime the aileron and flap parts. |
2004-10-15 | 3.0 | - Preparing to prime the aileron and flap parts. |
2004-10-16 | 5.0 | - Priming the aileron and flap parts. |
2004-10-17 | 4.0 | - Installing the flap brace and aileron gap fairings. |
2004-10-19 | 2.0 | - Ailerons (right, 1 each). |
2004-10-21 | 2.5 | - Assembling the right aileron. |
2004-10-23 | 7.0 | - Assembling the right flap. |
2004-10-24 | 2.0 | - Fitting the right flap and aileron. |
Fiberglass
2004-07-31 | 2.5 | - Left wing tip. |
2004-08-01 | 5.0 | - Left wing tip. |
2004-08-07 | 6.0 | - Left wing tip. |
2004-11-21 | 3.5 | - Right wing tip. |
2004-11-26 | 3.0 | - Right wing tip. |
2004-11-28 | 2.0 | - Right wing tip. |
Fixtures and stands
2004-02-08 | 15.0 | - Building the wing stand. |
2004-02-14 | 1.0 | - Building the cradle. |
2004-07-18 | 3.0 | - Building the wing storage rack. |
2004-07-24 | 3.0 | - Building the wing storage rack. |
2004-07-29 | 1.0 | - Finished the wing storage rack. |
2004-11-07 | 6.0 | - Building a paint stand.. |
2004-11-14 | 1.0 | - Finished building a paint stand. |
2007-05-19 | 1.0 | - Build another mini wing stand. |
2007-05-27 | 1.0 | - Got rid of the old wing stand. |
Fuselage (December 2004 - October 2007) 650.5 hours
Bulkheads
2004-12-30 | 6.0 | - Fuselage Kit arrives. |
2004-12-31 | 6.0 | - Fuselage Kit Inventory. |
2005-01-05 | 3.0 | - Fuselage Kit Inventory. |
2005-01-06 | 0.5 | - Fuselage Kit Inventory. |
2005-01-07 | 3.0 | - Preparing the bulkheads - firewall. |
2005-01-08 | 5.0 | - Preparing the bulkheads - firewall. |
2005-01-09 | 5.0 | - Preparing the bulkheads - firewall. |
2005-01-11 | 2.0 | - Deburring the firewall. |
2005-01-12 | 1.5 | - Alodining the firewall stiffeners. |
2005-01-14 | 2.0 | - Dimple and start riveting the firewall. |
2005-01-15 | 3.0 | - Riveting the firewall. |
2005-01-16 | 4.0 | - Assembling the F-704 bulkhead. |
2005-01-18 | 2.0 | - Assembling the F-704 bulkhead. |
2005-01-23 | 4.0 | - Assembling the F-704 bulkhead. |
2005-01-29 | 5.0 | - Assembling the F-704 bulkhead. |
2005-01-30 | 5.0 | - Assembling the F-704 bulkhead. |
2005-02-05 | 3.0 | - Assembling the F-704 bulkhead. |
2005-02-11 | 2.0 | - Assembling the F-704 bulkhead. |
2005-02-12 | 4.0 | - Assembling the F-704 bulkhead. |
2005-02-13 | 5.0 | - Finish F-704 bulkhead, start F-705. |
2005-02-18 | 2.0 | - Assembling the F-705 bulkhead. |
2005-02-19 | 4.5 | - Assembling the F-705 bulkhead. |
2005-02-20 | 6.0 | - Assembling the F-705 bulkhead. |
2005-05-11 | 1.0 | - Assembling the F-705 bulkhead. |
2005-05-18 | 2.0 | - Assembling the F-705 bulkhead. |
2005-05-20 | 3.0 | - Assembling the F-705 bulkhead. |
2005-05-25 | 2.0 | - Finish assembling the F-705 bulkhead. |
2005-05-29 | 6.0 | - Assembling the F-706 bulkhead. |
2005-06-01 | 2.0 | - Assembling the F-706 bulkhead. |
2005-06-14 | 8.0 | - Deburring the F-707, 708, 709 bulkheads. |
2005-06-16 | 5.0 | - Deburring the F-711, and 712 bulkheads. |
2005-06-19 | 3.5 | - Deburring and painting the bulkheads. |
2005-07-04 | 5.0 | - Riveting the rear bulkheads. |
AFT Section
2005-07-06 | 2.0 | - Finish the rear bulkheads, cut the longerons! |
2005-07-08 | 2.0 | - Bending the longerons! |
2005-07-09 | 3.5 | - Bending the right longeron. |
2005-07-11 | 3.5 | - Finishing the J-Channel. |
2005-07-17 | 4.0 | - AFT Fuselage Assembly. |
2005-07-20 | 2.0 | - AFT Fuselage Assembly. |
2005-07-23 | 3.0 | - AFT Fuselage Assembly. |
2005-07-24 | 3.0 | - AFT Fuselage Assembly. |
2005-07-28 | 2.0 | - Debur AFT Fuselage Assembly. |
2005-07-30 | 4.5 | - Debur AFT Fuselage Assembly. |
2005-07-31 | 3.5 | - Debur AFT Fuselage Assembly. |
2005-08-06 | 5.5 | - AFT Fuselage Assembly. |
2005-08-07 | 4.5 | - AFT Fuselage Assembly. |
2005-08-13 | 4.0 | - AFT Fuselage Assembly. |
Center Section
2005-08-14 | 3.5 | - Preparing the center Fuselage. |
2005-08-19 | 2.0 | - Preparing the center Fuselage. |
2005-08-20 | 4.0 | - Preparing the center Fuselage. |
2005-08-21 | 5.0 | - Preparing the center Fuselage. |
2005-08-23 | 2.0 | - Preparing the center Fuselage. |
2005-08-27 | 3.5 | - Preparing the center Fuselage. |
2005-08-28 | 3.5 | - Preparing the center Fuselage. |
2005-09-02 | 5.0 | - Preparing the center Fuselage. |
2005-09-03 | 2.0 | - Preparing the center Fuselage. |
2005-09-04 | 4.0 | - Preparing the center Fuselage. |
2005-09-05 | 4.5 | - Preparing the center Fuselage. |
2005-09-09 | 3.0 | - Preparing the center Fuselage. |
2005-09-10 | 5.5 | - Preparing the center Fuselage. |
2005-09-11 | 5.0 | - Assembling the center Fuselage--finally. |
2005-09-13 | 2.0 | - Assembling the center Fuselage. |
2005-09-14 | 2.5 | - Assembling the center Fuselage. |
2005-09-16 | 5.0 | - Assembling the center Fuselage. |
2005-09-17 | 3.0 | - Finished assembling the center Fuselage. |
2005-09-23 | 2.5 | - Joining the rear and center fuselage Assys. |
2005-10-02 | 5.0 | - Joining the rear and center fuselage Assys. |
2005-10-16 | 3.0 | - Joining the rear and center fuselage Assys. |
2005-10-23 | 4.0 | - Drilled the longerons. |
Forward Section
2005-11-20 | 0.0 | - Out of space. |
2005-11-25 | 5.0 | - Adding the forward fuselage. |
2005-11-26 | 3.5 | - Adding the forward fuselage. |
2005-12-04 | 3.5 | - Installing the aux longerons (F-713). |
2005-12-10 | 3.0 | - Installing the aux longerons (F-719). |
2005-12-11 | 2.0 | - Installing the aux longerons (F-719). |
2005-12-17 | 6.0 | - Installing the aux longerons (F-717). |
2005-12-18 | 3.5 | - Installing the aux longerons (F-684 gussets). |
2005-12-19 | 3.5 | - Installing the forward bulkheads (F-902). |
2005-12-20 | 3.0 | - Installing the forward bulkheads (F-786C). |
2005-12-21 | 2.5 | - Installing the forward bulkheads (F-786B). |
2005-12-22 | 2.5 | - Installing the forward bulkheads (F-786B). |
2005-12-24 | 2.0 | - Installing the rudder and brake pedals. |
2005-12-26 | 3.5 | - Installing the rudder and brake pedals. |
2005-12-27 | 3.0 | - Installing the rudder and brake pedals. |
2005-12-28 | 3.0 | - Installing the rudder and brake pedals. |
2005-12-29 | 4.0 | - Installing the rudder and brake pedals. |
2005-12-30 | 1.5 | - Installing the rudder and brake pedals. |
2006-01-02 | 4.0 | - Installing the rudder and brake pedals. |
2006-01-07 | 6.0 | - Installing the rudder and brake pedals. |
2006-01-08 | 4.5 | - Installing the floor stiffeners. |
2006-01-14 | 5.0 | - The Cabin - Framing the baggage area. |
2006-01-15 | 4.0 | - Preparing to rivet the side skins. |
2006-01-21 | 3.0 | - Preparing to rivet the side skins. |
2006-01-22 | 3.5 | - Preparing to rivet the side skins. |
2006-01-28 | 3.0 | - Preparing to rivet the side skins. |
2006-01-29 | 2.0 | - Preparing to rivet the side skins. |
2006-02-04 | 4.0 | - Preparing to rivet the side skins. |
2006-02-05 | 4.5 | - Preparing to rivet the side skins. |
2006-02-12 | 4.0 | - Preparing to rivet the side skins. |
2006-02-18 | 4.0 | - Preparing to rivet the side skins. |
2006-02-19 | 4.0 | - Preparing to rivet the side skins - right step. |
2006-02-25 | 5.0 | - Preparing to rivet the side skins - left step. |
2006-02-26 | 4.0 | - Preparing to rivet the side skins - step prep. |
2006-03-04 | 4.0 | - Preparing to rivet the side skins - deburring. |
2006-03-05 | 5.0 | - Preparing to rivet the side skins - baggage nutplates. |
2006-03-12 | 3.5 | - Riveting the side skins - center section AFT edge. |
2006-04-02 | 2.0 | - Riveting the side skins - preparing the left side skin. |
2006-04-08 | 3.5 | - Riveting the side skins - start with the left side. |
2006-04-09 | 3.0 | - Riveting the side skins - start on the right side. |
2006-04-15 | 6.0 | - Riveting the side skins - more prep. |
2006-04-16 | 4.0 | - Fit the main gear before riveting the side skins. |
2006-04-22 | 5.5 | - More fitting the main gear before riveting the side skins. |
2006-04-23 | 4.5 | - Riveting the side skins - FWD section. |
2006-04-29 | 2.0 | - Riveting the side skins - left bottom rivets. |
2006-04-30 | 3.0 | - Riveting the side skins - right bottom rivets. |
2006-05-06 | 3.0 | - Riveting the side skins - this and that. |
2006-05-20 | 2.0 | - Riveting the side skins - finished. |
2006-06-11 | 0.5 | - Tipped the canoe. |
Fixtures and stands
2006-06-25 | 4.5 | - Building the fuselage stand. |
Top
2006-07-01 | 1.0 | - Finishing up after the tip. |
2006-07-02 | 4.0 | - Riveting F-714 to the AFT fuselage. |
2006-07-03 | 4.5 | - Installing the side rails. |
2006-07-04 | 4.0 | - Installing the side rails. |
2006-07-08 | 4.5 | - Installing the side rails and F-695 gussets. |
2006-07-09 | 4.0 | - F-695 gussets, F-636, and more. |
2006-07-15 | 4.5 | - Elevator bellcrank and F-656 gusset plates. |
2006-07-16 | 4.5 | - Fitting the AFT top skins. |
2006-07-22 | 4.5 | - Fitting the AFT top skins. |
Cabin
2006-07-23 | 4.0 | - The baggage compartment (steps and AFT side covers). |
2006-07-29 | 3.5 | - The baggage compartment (steps and AFT side covers). |
2006-07-30 | 4.5 | - The baggage compartment (baggage bulkhead). |
2006-08-05 | 6.0 | - The baggage compartment (F-706 nutplates). |
2006-08-06 | 5.5 | - The baggage compartment (cable wear blocks). |
2006-08-12 | 5.0 | - The baggage compartment (deburr baggage bulkhead). |
2006-08-13 | 4.0 | - The baggage compartment (baggage bulkhead). |
2006-08-19 | 6.0 | - AFT seat floors (left seat hindges). |
2006-08-20 | 5.5 | - AFT seat floors and baggage floor access cover. |
2006-08-26 | 4.0 | - Baggage floor access covers (right side). |
2006-08-27 | 5.5 | - Baggage floor access covers (left side). |
2006-09-02 | 4.0 | - AFT seat floors (riveting the hindges). |
2006-09-03 | 4.0 | - FWD seat floors and control rod tunnel. |
2006-09-04 | 4.5 | - FWD seat floors and control rod tunnel. |
2006-09-05 | 5.0 | - Rear spar spacer, Seat backs. |
2006-09-06 | 4.5 | - Seat backs. |
2006-09-09 | 6.0 | - Seat backs (right seat). |
2006-09-10 | 5.5 | - Seat backs (left seat). |
2006-09-16 | 6.0 | - Forward covers. |
2006-09-17 | 5.0 | - Forward covers. |
2006-10-01 | 4.0 | - The electric flaps. |
2006-10-07 | 5.5 | - The electric flaps. |
2006-10-08 | 5.0 | - The electric flaps. |
2006-10-14 | 3.0 | - The electric flaps. |
2006-10-15 | 4.5 | - The electric flaps - done. |
2006-10-21 | 5.0 | - Installing the landing gear mounts (RV-7A only). |
2006-10-22 | 4.5 | - Finished installing the landing gear mounts. |
2006-10-28 | 2.0 | - Installed the main gear legs. |
2006-10-29 | 3.5 | - Control stick and rudder pedal assemblies. |
2006-11-04 | 4.0 | - Futzing around before fitting the wings. |
2006-11-05 | 5.0 | - Installing the front deck (slider only). |
2006-11-11 | 4.5 | - Installing the front deck (framework parts). |
2006-11-12 | 4.5 | - Installing the front deck (fake instrument pictures). |
2006-11-18 | 3.5 | - Installing the front deck (match drill top skin). |
2006-11-19 | 4.5 | - Installing the front deck (F-721 attach angles). |
2006-11-22 | 5.0 | - Installing the front deck (side vents). |
2006-11-24 | 5.0 | - Installing the front deck (top skin). |
2006-11-25 | 3.0 | - Fixing the screw-up (top skin). |
2006-12-02 | 0.0 | - Ready to fit the wings (a little diversion). |
2006-12-22 | 0.0 | - Ready to fit the wings (lost motivation). |
2007-05-13 | 0.0 | - Ready to fit the wings (need bolts). |
2007-05-19 | 0.0 | - Ready to fit the wings (have bolts). |
2007-09-02 | 4.5 | - Fit the right wing. |
2007-09-03 | 1.0 | - Futzing around with the right wing flaps. |
2007-09-08 | 4.0 | - Fabricate F-795 flap push rods. |
2007-09-09 | 3.5 | - Finish F-795 flap push rods. |
2007-09-29 | 1.0 | - Cutting hole for right F-795 flap push rod. |
2007-09-30 | 2.0 | - Finish cutting hole for right F-795 flap push rod. |
2007-10-13 | 2.0 | - Remove right wing. |
Firewall Forward (December 2004 - April 2009) 90.5 hours
Cooling System
2005-02-06 | 4.0 | - Oil Cooler arrives. |
2005-02-10 | 1.0 | - Straighten Oil Cooler fins. |
Engine
2004-12-10 | 0.0 | - Research. |
2005-02-21 | 8.0 | - Engine tear-down. |
2005-03-13 | 8.0 | - Engine tear-down. |
2005-03-20 | 10.0 | - Engine clean-up. |
2005-04-03 | 10.0 | - Engine clean-up. |
2005-04-09 | 7.0 | - Engine clean-up. |
2005-04-17 | 10.0 | - Engine clean-up. |
2005-04-24 | 5.0 | - Engine clean-up. |
2005-05-01 | 2.0 | - Engine clean-up. |
2005-05-19 | 0.5 | - New engine arrives. |
2005-07-10 | 4.0 | - Cleaning parts and the garage. |
2007-05-19 | 0.0 | - Got the redrive. |
2007-08-26 | 4.0 | - Repaint the oil pan, again. |
2008-08-05 | 0.0 | - We have an engine mount. |
2008-08-10 | 2.0 | - Painted the engine mount. |
2008-11-09 | 2.0 | - Started Building-up the Engine. |
2009-04-18 | 1.0 | - Engine Build - Big Nut, Counter Weight, Drive Plate. |
Engine Test Stand
2008-09-01 | 10.0 | - Building the Engine Test Stand. |
2008-09-20 | 2.0 | - Finished Building the Engine Test Stand. |
Interior (November 2006 - July 2008) 16.5 hours
Seat cushions and backs
2006-11-16 | 4.0 | - Sewed first seat cushion. |
2006-11-24 | 4.0 | - Sewed first seat back cover. |
2008-06-21 | 4.0 | - Sewed second seat cushion. |
2008-06-28 | 4.0 | - Sewed second seat Back cover - seats are done. |
2008-07-05 | 0.5 | - Pictures of finished upholestry. |